Boost your Grades with us today!

solution

Write a documented PLC program to implement the process shown. An up-counter must be programmed as part of a batch-counting operation to sort parts automatically for quality control. The counter is installed to divert l part out of every 10 for quality control or inspection purposes. The circuit operates as follows: A start stop pushbutton station is used to turn the conveyor motors (M1 and M2) on and off. A proximity sensor counts the parts as they pass by on the conveyor When 10 is reached, the counter’s output activates the gate Solenoid, diverting the part to the inspection line. The gate solenoid is energized for 0.3 second, which allows enough time for the part to continue to the quality control line. The gate returns to its normal position when the 0.3-second time period ends. The counter resets to zero and continues to accumulate counts. r A reset switch is provided to reset the counter manually. Quality control line Parts conveyer line Proximity Gate Switch solenoid drive

Solution:

15% off for this assignment.

Our Prices Start at $11.99. As Our First Client, Use Coupon Code GET15 to claim 15% Discount This Month!!

Why US?

100% Confidentiality

Information about customers is confidential and never disclosed to third parties.

Timely Delivery

No missed deadlines – 97% of assignments are completed in time.

Original Writing

We complete all papers from scratch. You can get a plagiarism report.

Money Back

If you are convinced that our writer has not followed your requirements, feel free to ask for a refund.